單項選擇題

A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which  also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed  systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs.
How can they manage the new machines for the least cost?()

A.Purchase a second HMC and use this to manage the new servers.
B.Connect all of the new servers to the existing private HMC network.
C.Configure a second private network on their existing HMC for the new servers.
D.Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題

A customer has 4 application and 2 database servers that will be installed in partitions on a Power 750. They are concerned that the database software vendor will charge based on every processor core in the server.
Which action will reduce the potential vendor software costs?()

A.Create capped partitions for the database servers.
B.Create workload partitions for the database servers.
C.Create a separate shared processor pool for the database servers.
D.Create virtual processors equal to the entitlement for database servers.

3.單項選擇題

A system administrator has been instructed to attach storage in their client LPARs, in a Power 770, with fibre channel adapters using N_port ID virtualization (NPIV).
Which of the following partitions has the minimum requirements to utilize virtual fibre channel?()

A.LPAR-A with 1Gb FC HBA and SAN connection
B.LPAR-B with 2Gb FC HBA and SAN connection
C.LPAR-C with 4Gb FC HBA and SAN connection
D.LPAR-D with 8Gb FC HBA and SAN connection

4.單項選擇題

A customer has shut down an LPAR after using DLPAR to add or remove processor and memory resources. When the partition is reactivated, the desired changes are missing.
What action, or sequence of actions, will immediately and permanently solve this problem?()

A.Add or remove the resources in the profile, click 'apply', then 'save'.
B.Add or remove the resources using DLPAR and change the partition profile.
C.Add or remove the resources using DLPAR, then shutdown and reactivate the LPAR.
D.Add or remove the resources in the system profile and reboot the managed system.

最新試題

A customer has an HMC-managed Power Systems server with 6 partitions. Four production partitions are subject to varying workloads throughout the day, and two are used for development and testing. The production applications have different licensing limitations on the number of physical cores that may be used. The development partitions can use no more than 1 core. The customer would like to dynamically optimize processor utilization within the licensing limits, with minimal operator intervention.Which of the following meets the customer requirement?()

題型:單項選擇題

A customer requires their application to have high availability within a data center, and also the ability to recover at a data center located 600km away in the event of an outage.Which system software solution component supports the customer requirement?()

題型:單項選擇題

Which system provides the highest performance per core, and the least cost for applications licensed per core?()

題型:單項選擇題

Which of the following has an integrated database?()

題型:單項選擇題

A POWER7 processor has L1, L2 and L3 caches. Which of the three caches uses embedded DRAM (eDRAM) technology?()

題型:單項選擇題

A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which  also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed  systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs.How can they manage the new machines for the least cost?()

題型:單項選擇題

Ancustomer with limited storage management skills needs a disk subsystem with up to 70TB capacity and enterprise class performance. Which disk storage system should be recommended?()

題型:單項選擇題

A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable it to an I/O drawer.Which of the following must also be ordered?()

題型:單項選擇題

A customer plans to consolidate multiple business unit applications on a single Power Systems server. The maximum number of cores which can be used by each business unit must be limited by creating shared processor pools.What is the minimum PowerVM Edition which provides this feature?()

題型:單項選擇題

An end user is deploying Blade servers to replace obsolete rack mounted servers. In addition to AIX Web server and database workloads, they also have Windows workloads.Which Blade is designed for Windows workloads?()

題型:單項選擇題