A.0.80
B.0.16
C.1.60
D.0.10
您可能感興趣的試卷
你可能感興趣的試題
A.Parallel and Serial
B.Serial and Asynchronous
C.Parallel and Synchronous
D.Synchronous and Asynchronous
A customer has several single partition POWER5 and POWER6 processor-based systems housed in regional data centers and wants to consolidate into a single Power 770. They must minimize overall cost and the number of adapters, while ensuring a reliable infrastructure.
Which solution addresses the customer requirements?()
A.Move the storage into a common SAN and virtualize the I/O using a single VIO Server with dual NIC connectors and dual HBAs
B.Move the existing physical network and storage adapters to the new system and virtualize the I/O using a single VIO Server.
C.Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, each with dual NIC connectors and dual HBAs.
D.Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, one with dual NIC connectors and the other with dual HBAs.
A customer would like to have the ability to permanently activate processor and memory resources as their workload increases.
Which of the following supports the customer requirement?()
A.Reserve Capacity on Demand
B.Utility Capacity on Demand
C.Capacity Upgrade on Demand
D.Uncapped Capacity on Demand
When a customer attempts to manage virtual machines, virtual images and system pools with the VMControl Express Edition, all operations fail except for managing virtual machines.
What is recommended to resolve this situation?()
A.Upgrade to VMControl Standard Edition
B.Upgrade to VMControl Enterprise Edition
C.Upgrade to latest version of VMControl Express Edition
D.Download the latest fixes for VMControl Express Edition
A.Manage multiple operating systems on a server
B.Manage energy consumption and network traffic to increase efficiency
C.Manage LPARs, operating systems and servers to reduce administration
D.Manage workloads across multiple servers to optimize resource utilization
最新試題
A customer has a 4-core POWER6 570 with 4 partitions and a 2-port 1Gbps Integrated Virtual Ethernet (IVE) Adapter. They are having problems with throughput on the Ethernet adapter and want to improve performance.Which of the following solutions will help the customer with this issue for the least cost and with the least interruption?()
An end user is deploying Blade servers to replace obsolete rack mounted servers. In addition to AIX Web server and database workloads, they also have Windows workloads.Which Blade is designed for Windows workloads?()
A customer is evaluating PowerVM and VMware to run a data warehouse application. Which feature of PowerVM should be highlighted as a differentiator?()
A Power 720 customer using IVM wants to implement dual VIO servers, but is unable to create the second server. What is the most likely reason for this?()
Ancustomer with limited storage management skills needs a disk subsystem with up to 70TB capacity and enterprise class performance. Which disk storage system should be recommended?()
Which of the following configuration is valid for expansion drawers on a Power 750 with 2 processor board sinstalled?()
A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()
A customer has 4 application and 2 database servers that will be installed in partitions on a Power 750. They are concerned that the database software vendor will charge based on every processor core in the server.Which action will reduce the potential vendor software costs?()
How can resource allocations for an active partition on a Power 750 be changed immediately and permanently?()
A customer is installing an HMC-managed Power 720 with two partitions, one for Production the other for Testing. They plan to use the Testing partition only occasionally and want to minimize hardware.Which of the following meets these requirements?()