A customer is planning on having a single Virtual I/O Server (VIOS) configuration in a Power 750. They haveselected a 4-port 1Gb Integrated Virtual Ethernet (IVE). There will be no other network cards installed in the system. One IVE logical port will be used in the VIO Server and will be used as the physicalport in a Shared Ethernet Adapter (SEA).
What is the maximum number of IVE logical ports available to use inother LPARs?()

A.1
B.7
C.15
D.31


您可能感興趣的試卷

你可能感興趣的試題

2.單項選擇題When considering migrating a POWER6 server with PCI-X and PCIe adapters to a Power 720, which statement is true?()

A.PCIe adapters are supported only in I/O drawers
B.PCI-X adapters are supported in both the CEC and in I/O drawers
C.PCI-X adapters are supported in the CEC; PCIe adapters are supported in 12X I/O drawers
D.PCIe adapters are supported in the CEC; PCI-X adapters are supported in 12X I/O drawers

5.單項選擇題

A customer has a 32-core Power 770 with 4 AIX partitions and 2 IBM i partitions. They want to improve network availability and allow for concurrent maintenance.
What will support the customer requirement at  least cost?()

A.Build the logical partition infrastructure based on 6 or more VLANs.
B.Build the logical partition infrastructure based on two or more IVEs.
C.Build the logical partition infrastructure based on Partition Mobility.
D.Build the logical partition infrastructure based on redundant VIO Servers.

最新試題

A customer wants to implement the following Blades in BladeCenter H:Two POWER Blades running IBM i partitions.Two POWER Blades running AIX and LinuxFour x86 Blades running Windows.Which of the following design consideration statements is correct?()

題型:單項選擇題

A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable it to an I/O drawer.Which of the following must also be ordered?()

題型:單項選擇題

A customer would like to configure an uncapped LPAR so that it can use 2 to 8 cores depending on the workload characteristics. With SMT4 enabled, what is the least amount of processing resources which can be configured for the LPAR?()

題型:單項選擇題

A Power 720 customer using IVM wants to implement dual VIO servers, but is unable to create the second server. What is the most likely reason for this?()

題型:單項選擇題

How can resource allocations for an active partition on a Power 750 be changed immediately and permanently?()

題型:單項選擇題

A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750.Which action allows the most efficient use of existing equipment?()

題型:單項選擇題

Which of the following is a compelling reason to deploy IBM Systems Director Active Energy Manager (AEM) in a data center with high energy utilization?()

題型:單項選擇題

A customer is installing an HMC-managed Power 720 with two partitions, one for Production the other for Testing. They plan to use the Testing partition only occasionally and want to minimize hardware.Which of the following meets these requirements?()

題型:單項選擇題

A customer has a 4-core POWER6 570 with 4 partitions and a 2-port 1Gbps Integrated Virtual Ethernet (IVE) Adapter. They are having problems with throughput on the Ethernet adapter and want to improve performance.Which of the following solutions will help the customer with this issue for the least cost and with the least interruption?()

題型:單項選擇題

Which of the following items in a single enclosure Power 770 improves Reliability, Availability, and Serviceability?()